The customer is responsible for the installation of a fused 3 phase quick disconnect electrical box within 10 feet of each type of equipment to be installed and a concrete wire mesh or rebar reinforced equipment pad exceeding 3,000 lb. PSI weight ratings and measuring the following
dimensions. Equipment pads for Self-contained and Stationary Compactors should be 10’ to 12’
wide x 40’ to 50’ long x 6” to 8” thick concrete. Vertical Compactors and Vertical Balers should be bolted to a 10’ wide x 10’ long x 6” to 8” thick concrete pad.
In-addition, customer is responsible to have a certified electrician hook-up power unit or any
hard piping of controls and conduit to meet all local building and electrical codes. Lastly, overhead restrictions must be adhered to and in most cases a site survey is made to determine proper options, unit placement, and OSHA and ANSI Compliance requirments.